user story #133 (closed: DONE)

AgileAdmin? should be able to influence how previous iterations are used to calculate the points per completion rate

Test Complete Size: 3 Test Complete Date: 11/17/2011
Documentation Complete Size: 1 Documentation Complete Date: 11/17/2011
Acceptance Complete Size: 1 Acceptance Complete Date: 11/17/2011
Reported by: ja11sop Owned by: ja11sop
Milestone: Clean up of Plugin with Patch Component: release planning
Version: Keywords:
Cc: Blocked By:
Blocking: Patch SVN Revision:
Patch Trac Version: not_applicable
In Iterations: None

Description


Change History

Have a look at the list of modified files related to this ticket.

Changed 7 years ago by ja11sop

  • acceptance_complete_date set to 11/17/11
  • status changed from sized to closed
  • doc_complete_date set to 11/17/11
  • resolution set to DONE
  • test_complete_date set to 11/17/11