Opened 10 years ago

Last modified 10 years ago

userstory #36 (sized)

EndUser? will be given a choice of points per iteration and iteration durations based on arbitrary views of this information.

Test Complete Size: 5 Test Complete Date:
Documentation Complete Size: 5 Documentation Complete Date:
Acceptance Complete Size: 5 Acceptance Complete Date:
Reported by: ja11sop@… Owned by:
Milestone: Near Term Component: release planning
Version: Keywords:
Cc: Blocked By:
Blocking: Patch SVN Revision:
Patch Trac Version:
In Iterations: None

Description

EndUser? will be given a choice of points per iteration and iteration durations based on arbitrary views of this information. For example the two obvious views are short and long term averages of these values, plus, perhaps, upper and lower quartile versions.

Change History

Have a look at the list of modified files related to this ticket.

Changed 10 years ago by ja11sop@…

  • summary changed from EndUser will be given a choice of points per iteration and iteration durations based on arbitrary views of this information. For example the two obvious views are short and long term averages of these values, plus, perhaps, upper and lower quartile versions. to EndUser will be given a choice of points per iteration and iteration durations based on arbitrary views of this information.

Changed 10 years ago by ja11sop@…

  • component changed from agiletrac patch to core to release planning
  • milestone changed from Plugin with Patch against Trac 0.11 to Near Term

Changed 10 years ago by jamiea

  • status changed from new to sized
  • test_complete_size set to 5
  • doc_complete_size set to 5
  • acceptance_complete_size set to 5
Note: See TracTickets for help on using tickets.